Your browser doesn't support javascript.
Show: 20 | 50 | 100
Results 1 - 2 de 2
Filter
Add filters

Database
Language
Document Type
Year range
1.
International Ocean Discovery Program: Preliminary Reports ; 395, 2021.
Article in English | Scopus | ID: covidwho-2100458

ABSTRACT

International Ocean Discovery Program (IODP) Expeditions 390C and 395E were implemented in response to the global COVID-19 pandemic and occupied sites proposed for the postponed Expeditions 390 and 393, South Atlantic Transect 1 and 2. Expedition 395E completed most of the preparatory work that Expedition 390C did not have time to complete. The overall objective of Expeditions 390C and 395E was to core one hole at each of the South Atlantic Transect sites with the advanced piston corer/extended core barrel (APC/XCB) system to basement for gas safety monitoring and to install a reentry system with casing through the sediment to a few meters into basement in a second hole. Expedition 395E started in Cape Town, South Africa, and ended in Reykjavík, Iceland, after 20 days of on-site operations. We cored to basement at two new sites, U1560 and U1561, and completed reentry systems at three sites, U1556, U1557, and U1560. These operations will expedite basement drilling during the rescheduled Expeditions 390 and 393. Hole U1560A (Proposed Site SATL-25A) lies in ~15.2 Ma crust and is composed of carbonate-rich sediments to 120 meters below seafloor (mbsf) and 2.5 m of underlying basalt. A reentry system was deployed in Hole U1560B to 122.0 mbsf. We then moved to the sites at the western end of the transect on ~61 Ma crust. In Hole U1557D, 10¾ inch casing was deployed to 571.6 mbsf to deepen the 16 inch casing that was deployed during Expedition 390C, and in Hole U1556B, a reentry system was deployed to 284.2 mbsf. The remaining operations time was insufficient to install a reentry system at the originally planned site, Proposed Site SATL-33B. Instead, we cored Hole U1561A (Proposed Site SATL-55A) to 47 mbsf. It is composed of red clay and carbonate ooze overlying 3 m of basalt. The six primary sites of the South Atlantic Transect lie perpendicular to the Mid-Atlantic Ridge on the South American plate, overlying crust ranging in age from 7 to 61 Ma. Basement coring will increase our understanding of how crustal alteration progresses over time across the flanks of a slow/intermediate-spreading ridge and how microorganisms survive in deep subsurface environments. Sediment will be used in paleoceanographic and microbiological studies. © 2021 Authors. All rights reserved.

2.
International Ocean Discovery Program: Preliminary Reports ; 390, 2021.
Article in English | Scopus | ID: covidwho-2100455

ABSTRACT

International Ocean Discovery Program (IODP) Expedition 390C was implemented in response to the global COVID-19 pandemic and occupied sites proposed for the postponed Expeditions 390 and 393. The objectives for Expedition 390C were to core one hole at each site with the advanced piston corer/extended core barrel (APC/XCB) system to basement for gas safety monitoring and to install a reentry system with casing through the sediment to between ~5 m above basement and <5 m into basement in a second hole. These operations will expedite basement drilling during the rescheduled South Atlantic Transect Expeditions 390 and 393. The six primary sites for those expeditions form a transect perpendicular to the Mid-Atlantic Ridge on the South American plate, overlying crust ranging in age from 7 to 61 Ma. Basement coring will increase our understanding of how crustal alteration progresses over time across the flanks of a slow/intermediate spreading ridge and how microorganisms survive in deep subsurface environments. Sediment will be used in paleoceanographic and microbiological studies. Expedition 390C started in Kristiansand, Norway, and ended in Cape Town, South Africa, after 31 days of operations. We cored a single APC/XCB sediment hole to the contact with hard rock material at four of the six sites and successfully installed reentry systems with casing at three. Two failed attempts at drilling in casing and a reentry system into hard rock at Site U1558 indicate that the Dril-Quip reentry cones and running tools are incompatible with use in hard rock because the release mechanism does not work when the casing string weight cannot be fully removed from the running tool. Therefore, at Sites U1558 and U1559, casing was installed to ~10 m above basement. Site U1557 has a thick sediment cover (564 m) and will require multiple casing strings to reach basement;a single 16” casing string was installed to 60 meters below seafloor at this site, and later expeditions will extend casing. © 2021 Authors. All rights reserved.

SELECTION OF CITATIONS
SEARCH DETAIL